A. Call to Order – Roll Call
B. Introductions
C. Approval of minutes
Approve minutes of the July 5, 2023 regular meeting.
D. Announcements/Staff Reports
Receive announcements or reports from staff on matters of interest to the Hearing Board. There will be no Hearing Board discussion except to ask questions or refer matters to staff; and no action will be taken unless listed on a subsequent agenda.
E. Public Comment Period
Persons desiring to address the Hearing Board on any subject within the jurisdiction of the Hearing Board not included as part of the agenda may do so at this time.
F. Public Hearings
F-1) Case No. 2021-12-M2 (Modification of Final Compliance Date, and Modifications of Increments of Progress)
Mustang Renewable Power Ventures, LLC. 17 Corporate Plaza Drive, Suite 200, Newport Beach, CA 92660
To consider a Petition for Modification of Regular Variance from District Rule 206, Authority to Construct 14500-05, Conditions, 9.C.2.b.iii, 9.C.4.a.i, 9.C.4.a.ii, 9.C.4.a.iii, 9.C.4.a.v, 9.C.4.a.vi, 9.C.4.a.viii, 9.C.4.a.x, 9.C.4.a.xi, 9.C.4.b.i, 9.C.4.b.ii, 9.C.4.b.iii, 9.C.4.c.i, 9.C.4.c.ii, 9.C.4.c.iii, 9.C.5.b.i, 9.C.5.b.ii, 9.C.5.b.iii, 9.C.5.b.v, 9.C.5.b.vi, 9.C.5.b.viii, 9.C.5.b.xi, 9.C.5.b.xii, 9.C.5.b.xv, 9.C.5.c.i, 9.C.5.c.ii, 9.C.5.c.iv, 9.C.5.c.v, 9.C.5.c.vi, 9.C.5.c.vii, 9.C.5.c.viii, 9.C.5.c.ix, 9.C.5.d.i, 9.C.5.d.ii, 9.C.5.d.v, 9.C.5.d.vi, 9.C.5.d.vii, 9.C.5.d.viii, 9.C.5.d.ix, 9.C.6.a.i, 9.C.6.a.ii, 9.C.6.a.iii, 9.C.6.a.iv, 9.C.6.b.i, 9.C.6.b.ii, 9.C.6.b.iii, 9.C.6.c.i, 9.C.6.c.ii, 9.C.6.c.iii, 9.C.18 (tipping area and materials sorting area biofilters only), 9.C.19.b.i, 9.c.19.b.ii, 9.c.19.b.iii, 9.c.19.b.iv, 9.c.19.b.v, 9.c.19.b.vi, 9.C.33.a, and 9.C.33.f, submitted on September 6, 2023, for continued operations of the Material Recovery Facility (MRF) without the following equipment that was damaged by the 2021 Alisal Fire: MRF baghouses, MRF scrubbers, and MRF biofilters.
| Petition | Staff Report | Attachment 1 | Attachment 2 | Attachment 3| Attachment 4 | Attachment 5 (Draft Variance)|
| Presentation |
F-2) Case No. 2023-03-A (Abatement Order)
Central Coast Agriculture 85 W. Highway 246, #233, Buellton, CA 9342
To consider a Petition by the Air Pollution Control Officer of the Santa Barbara County Air Pollution Control District submitted on September 5, 2023, for issuance of an Order of Abatement pursuant to Health and Safety Code §42450. Central Coast Agriculture, Inc., Central Coast Agriculture, LLC, Central Coast Ag Distribution, LLC, Central Coast Ag Farming, LLC, and Central Coast Ag Products, LLC (collectively “CCA”) operates cannabis product manufacturing, volatile extraction, storage and distribution facilities and is currently operating without the required best available control technology to control emissions, or the required District Permits, in violation of District Rule 201. The CCA facilities subject to this Petition are located at 1201 W. Chestnut Avenue and 1200 West Laurel Avenue in Lompoc, CA.
On September 12, 2023, Respondent CCA requested a 60-day continuance of the hearing on Item F-2.
- Petition | Exhibit 1 | Exhibit 2 (1 of 2) | Exhibit 2 (2 of 2)
- Notice of Affidavits | Exhibit 1 | Exhibit 2 | Exhibit 3 | Exhibit 4 | Exhibit 5 | Exhibit 6
- Request for Continuance
- Respondent’s Answer to Petition for Order of Abatement
- District’s Response to Request for Continuance
- Notice of Affidavits and Reservation of Rights | Affidavit of Lindsay Cokeley | Affidavit of Laura Nuzzo | Affidavit of Matthew Allen | Exhibit 1 | Exhibit 2 | Exhibit 3 | Exhibit 4 | Exhibit 5 | Exhibit 6 | Exhibit 7 (1 of 3) | Exhibit 7 (2 of3) | Exhibit 7 (3 of 3)| Exhibit 8 | Exhibit 9 | Exhibit 10 | Exhibit 11 | Exhibit 12 | Exhibit 13 | Exhibit 14 | Exhibit 15 | Exhibit 16 | Exhibit 17 | Exhibit 18 | Exhibit 19 | Exhibit 20 | Exhibit 21 | Exhibit 22 | Exhibit 23 | Exhibit 24 | Exhibit 25 | Exhibit 26 | Exhibit 27
- Respondents Renewed Request for Continuance
- District Concur with Request for Continuance
| Presentation |
G. Administrative Agenda
G-1) Case No. – 2023-01-I
Advenco, LLC, dba Lake Cachuma, 2275 Highway 154, Santa Barbara, CA
On June 28, 2023, Hearing Board member Terence Dressler approved an Interim Variance for Advenco, LLC, dba Lake Cachuma from June 2, 2023 through August 29, 2023, or the date a decision is made on a 90-Day Variance, whichever occurs first. Said Interim Variance provides relief from District Rules District Rules 316.C.2, C.3 and G and 206, Permit to Operate 12345, Conditions 2.b, 4, 6, and 8 and allows for continued use of the gasoline dispensing facility without properly operating vapor recovery equipment.
The 90-Day Variance petition was withdrawn by the Petitioner on August 2, 2023 because the gasoline dispensing facility vapor recovery equipment was re-tested on July 25, 2023 and determined to be properly operating.
H. Adjourn
The next regularly scheduled meeting of the Santa Barbara County Air Pollution Control District Hearing Board is November 1, 2023, at 9:30 a.m. Meeting is subject to cancellation if there are no items to be heard.